About the project

  • Construction Year: 2015
  • Client: Metka-EGN
  • Category:
  • Location: Nefyn, Pwllheli, UK
  • Key Applications: Energy Production
  • Capacity: 5 MW
A 5 MW PV Project located in Nefyn, Pwllheli, UK. 2 Substations with 1 Powerelectronics Inverter on Each on 1 Main Substation.